New Building Updates
Last updated 4/11/26

Celestial Windows
The raised center aisle roofing is on and the celestial windows are now installed.



Black Metal Trim
The black metal corner trim was custom made and is now installed. It has to go on before the cladding which is onsite ready to be installed.
Custom Windows
The custom made windows from Europe finally arrived, and are being put on from the top down. It will take a while due to their size.



Plumbing and Electrical
Rough-in
Both plumbing and electrical rough-in is almost complete. This is a picture of the restrooms.
Entry Angle
This is the angle from the driveway just inside the entrance.
The wooden fence will be removed after the exterior is completed.


Venue Angle
This is the angle from near the Groom's room.
Pond Angle
This is the angle from the pond nearest the tent,
The tent and the wooden fence will be removed before any events are held in the new building.


Ball Room
This is the inside of the ballroom before anything is covered up.